GEOSIGHT Ltd was commissioned by DEME to conduct a dimensional control survey of the new build cable lay vessel ’Living Stone’. The survey was conducted whilst the vessel was out of the water in the DAMEN shipyard in Rotterdam, Netherlands, between the 30th May & 4th June 2018.
The dimensional control survey included the following procedures:
For the purpose of this dimensional control survey, all measured nodes were established within a tolerance of ±0.005m relative (at the 95% confidence level) in X, Y and Z. The rotations of sensors around the X, Y and Z axis were determined by the dimensional control survey to within ±0.02 degrees (at the 95% confidence level).
Service: Dimensional Control Survey
Purpose of Survey: New build of cable lay vessel ‘Living Stone’
Client: DEME
Environment: Dry dock shipyard
Location: Rotterdam, Netherlands
Year: 2018
Timescale: 5 days
Equipment: Leica TCRP 1201 Total Station, Leica TS12 Total Station, Leica GX1230 GG GNSS Receiver, Leica GS14 GNSS Receiver, Leica Precision 360 & Circular Prisms
Output: DWG, PDF